• Home
  • Our Applications
    • Proflux for Wells
      • Wellflux: Annular Injection
      • Wellflux: Coil Tubing
      • A Case Study at the Battery
      • Proflux: Completions & Workovers
    • Proflux for Transport
      • Transflux: Pipeline
    • Proflux for Reservoir
      • Terraflux for E.O.R
      • Thermflux: C.S.S.
  • Technology & Environment
    • What is Proflux?
      • A Testimonial From Prosper Petroleum
      • Reducing Heavy Oil Viscosity
      • Sustaining Increased Production
      • A Lloydminster Case Study
      • Terraflux: Case Study
    • Our Green Side
  • About Us
    • Company Profile
    • Management Profiles
      • Fred Meyer, CEO
      • Ahmed Aljubori, Vice President
      • Dr. Phil Fletcher, Technical Director
      • Steve Dallison, Operations and Engineering Director
      • Steve Rue, Financial Director
      • Dr. Jeff Forsyth, Senior Business Development Manager
      • Patrick Pidgeon, Sales and Marketing Manager
    • Careers
    • Health and Safety
    • Locations
  • News

Sustaining Increased Production

 

The Challenges:

  • Torqued out
  • High fluid level
  • Constricted flow

Originally producing at a rate of 11.0 m3 per day, this Peace River horizontal well continues to be Oilflow Solutions’ longest running well at over 18 months.

Wellflux, through its coiled tubing injection technique, demonstrated a 42.8% decrease in torque. Through on-site staff monitoring, production has since averaged 16.0 m3 per day.  

 

The Results:

Torque Reduction of

42%

Wellflux reduced torque by 42.8% within a few days. Torque decreased from 2,320 to 1,345 psi while the client was able to replace recycled hot water with Wellflux and improve performance.

Pump Speed Increase

79%

With a pump speed baseline of 128 rpm, the 42.8% torque reduction, Wellflux increased PCP speed to 230 rpm - nearly doubling its original rate.

Production Increase of

45%

By reducing torque and increasing pump speed, Wellflux increased net oil production from 11.0 m3/day to 16.0 m3/day with production sustained for over a year.

 

 

 

 

>> Read our next case study: Success in Lloydminster